Fisher Tools Progress Update – Week 11

This week the masons are cruising right along with the exterior masonry wall. That’s it for this week’s update. Come back next week and…. [insert lead into next post]. In the meantime, if you’d like more information about warehouse building or have questions on how to...

Fisher Tools Progress Update – Week 10

This week the foundation is placed and is curing. The masons have set up jack scaffolds in one corner and they have stocked materials around the perimeter of the foundation in preparation to start the structural exterior walls. Did you know it takes concrete 28 days...

Fisher Tools Progress Update – Week 9

The foundation prep work is just about complete and the underground utilities are being installed. It is crucial at this stage to check and double check all the conduits, piping, sleeves and penetrations are where they need to be. Once the foundation is placed we...

Fisher Tools Progress Update – Week 8

This week we are preparing the soil for the foundation. Engineering specifications require a minimum compaction for soil before a foundation is placed which is usually 98% compaction. This helps prevent the building from settling unevenly which can cause serious...